Dixon-valve 50 TON RAM SEC06 External Swaged Ground Joint User Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 7
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
Boss Ground Joint Holedall Couplings
customer service 8003551991
4 Section 6
50 Ton Ram Instruction Manual
Move the directional control lever to the
“FORWARD” position and depress the button on the
remote. Advance the cylinder forward until the end
of the ferrule is near the die opening. Using a
wooden board or metal pipe, lift the ferrule up. Jog
the cylinder by depressing and releasing the button
on the remote. This will allow the ferrule to enter the
die slowly. After the ferrule has entered the die, stop
advancing the cylinder.
Align the wing nut (or spud) with the pusher
ensuring they are flush with each other. Jog the
cylinder forward until pressure begins to register on
the gauge. Leave the directional control lever in the
“FORWARD” position. Check the alignment
between pusher and wing nut (or spud). If any
adjustment is necessary, do it now.
Reposition the tie down bars on the die face so that
the wing nut (or spacer) will clear.
Depress and hold the button on the remote until the
wing nut (or spacer) contacts the die face. Release
the button. Return the directional control lever to the
“NEUTRAL” position.
Note! For 3/4" and 1" couplings having the ferrule
crimped on, stop the swage when the crimped area
of the ferrule begins to enter the die.
Note: If the gauge reads 10,000 PSI before swaging
is complete, stop. The ferrule or die used for that
hose end may be incorrect. Contact Dixon for
further assistance.
9c
9b
10a
9a
Page view 5
1 2 3 4 5 6 7

Comments to this Manuals

No comments